Pics of the Month

Emergency shoring to a collapsing roof truss 25′ above the ground

Emergency shoring to a collapsing roof truss 25′ above the ground

Hollow Bar Micro Piles


Bowing Basement Wall

1800’s Victorian Header beam replacement at front foyer. Original columns salvaged and reinstalled

Owning the right equipment to get the job done: micro pile and void filling underpinning

We were there for emergency services when Hurricane Irene struck

Underpinning Using Titan Hollow Bar Micro Piles

1000 LBS “I-Beam”

Don’t wait, get those stairs and decks taken care of before your end of summer party!

3.5 Inch Helical Shaft

Those termites sure do get hungry…

These cracks in the brick may seem small, but they are actually a sign of a major structural problem

We get the job done!

Lone termite

Bobby flying over the tanks